search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • TOPICS
    • Cool Roofing
    • Event News
    • Latinos in Roofing
    • Low Slope
    • Legal
    • Metal
    • Project Profiles
    • Roofing Supply Pro
    • Roofing Safety
    • Steep Slope
    • Sustainable Roofing
    • Technology
  • EXCLUSIVES
    • Best of Success
    • Contractor Profile
    • IRE Show
    • Roofing Contractor of the Year
      • Enter Roofing Contractor of the Year
    • Top 100
      • Enter the Top 100
    • Young Guns
    • State of the Industry
  • MULTIMEDIA
    • Videos
    • Podcasts
    • Interactive Spotlights
    • Roofing Quizzes
    • IRE Videos
    • Webinars
    • Photo Galleries
  • PRODUCTS
    • New Products
    • Featured Products
  • COLUMNS
    • Editor's Note
    • Exit Planning
    • Guest Column
  • EVENTS
    • International Roofing Expo
    • Webinars
    • Best of Success Conference
    • Industry Events
  • DIRECTORY
    • Associations
    • Distributors
    • Manufacturer/Supplier
    • Business Services
    • Get Listed
  • MORE
    • Roofing Contractor Newsletters
    • Techos y Más Advisory Board
    • RC Store
    • Roofing Supply Pro
    • Custom Content & Marketing Services
    • Market Research
    • Sponsor Insights
    • Company Spotlights
    • Classifieds
      • Auctions
      • Business For Sale
      • Business Opportunities
      • Equipment For Sale
      • Positions Available
      • Products
      • Safety
      • Software
      • Services
      • Training
    • Contact Us
  • EMAGAZINE
    • eMagazine
    • Advertise
      • Editorial Calendar
      • Contact
    • Archive Issues
  • SIGN UP!
Low Slope RoofingRoofing Project Profiles

City Center DC: Tying Together the Roof and Building Envelope

By Todd C. Skopic
January 1, 2014

CityCenterDC is a behemoth of a project. The mixed-use development was envisioned as the centerpiece of Washington, D.C., with a mix of condominiums, apartments, offices, public spaces, restaurants, shops and a hotel. The site is 10 acres and takes up four city blocks. There are six buildings that have a total of 2.5 million square feet of space. This is a $700 million development with a construction cost of $425 million.

Groundbreaking occurred in May 2011 with substantial completion scheduled for early 2014. The design architect is Foster and Partners from London. The architect of record is the local D.C. firm, Shalom Baranes Associates.

One of the design challenges is that all six roofs are occupied or planted. This made it even more critical to have a bulletproof waterproofing/roofing system.

The system of choice here was the Henry Company 790-11 Hot Rubberized Asphalt (HRA). This is an Inverted Roof Membrane Assembly (IRMA) consisting of: 215 mils of reinforced hot rubberized asphalt, 80-mil protection base ply, Owens Corning extruded polystyrene rigid insulation, and then either a paver or vegetative overburden cover.

The applicator that masterminded and successfully executed the Division 7 (Thermal and Moisture Protection) contracts and construction was Gordon Contracting of Capital Heights, Md. Gordon Contracting was responsible for the foundation waterproofing, plaza deck waterproofing, expansion joints, air/vapor barrier, deck coating, IRMA roof with pavers and vegetative roof. The company’s work was split up into four distinct areas: Retail, Office, Condo, and Garage. The project manager for Gordon Contracting was Jeff Wooldridge. He had to manage many balls in the air over a period of 26 months and a crew that ranged in size from 8 to 30.

One of the first challenges to be identified involved the metal decks. The cast-in-place concrete roof deck was to be poured on vented metal deck. This venting allows the concrete to dry more rapidly. Fortunately, Jerry Hangsleben, a D.C.-based field tech rep for the Henry Company, immediately noted that the steel deck was non-vented. In conjunction with the envelope consultant, Simpson Gumpertz & Heger (SGH), a decision was made to drill a plethora of holes in the metal decking to receive the hot rubberized asphalt that was supplied by the Henry Company. The concrete was given a good 45-plus days to cure, so the moisture in the slab was not an issue.

Coordinating all of the elements of the various roof projects was a monumental task. Fortunately, Steve Gordon of Preservation and Protection Systems Inc. (PPSI), a mainstay in this market for more than 30 years, was up to the challenge. With his relationships, Gordon was able to tie together the entire building envelope on behalf of the Henry Company and the other building envelope manufacturers he represents. One example of Gordon’s attention to detail and his commitment to the project was a plant tour that he executed to the Hanover Paver Plant in Hanover, Pa., with representatives from both Shalom Baranes Associates and Foster and Partners.

There were several critical aspects of the building envelope, including the fire-rated expansion joints. These expansion joints formed the bridge between the waterproofing membrane and the concrete deck. Brian Baker, also of PPSI, was with the expansion joint manufacturer, Emseal, at the time of the design and construction. According to Baker, “Part way into the design, the Fire Marshall determined that these joints needed to be fire rated.” To accomplish this, Emseal recommended a double system of both a primary expansion joint (Migutan) and a secondary joint (DFRZ/3) that carries a three-hour rating. The expansion joints tied into the HRA that was supplied by the Henry Company. These two manufactures can offer joint warranties for their systems when properly specified and integrated.

There was approximately 250,000 square feet of reinforced HRA system applied to many of the horizontal surfaces. The flashing that was used was a torch-applied modified bitumen (MB). Torch-applied flashing is more robust and longer lasting than uncured neoprene. However, uncured neoprene is still required for detailing drains as it is more flexible. MB flashing has significantly more tensile strength at 100 foot-pounds per inch (machine direction). Uncured neoprene has greater elongation at 300 percent (ASTM D412).

In addition to the IRMA roof, Henry Company supplied all the air and vapor barrier. With all the insulation being in the cavity, the design team decided to use a non-permeable air barrier system. Originally, only the Blueskin SA peel-and-stick membrane was specified. During construction, it was determined to change the overhang areas to a fluid-applied, non-permeable system, Air-Bloc 32 MR.

 This huge project presented many challenges. Due to a great team effort, the applicator, Gordon Contracting, was able to keep it all together while tying the entire building envelope together.  

KEYWORDS: asphalt roofing expansion flashing green roofing

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Todd C. Skopic, CSI, CDT, LEED AP, is the Northeast Regional Building Science Specialist with the Henry Company. He has been involved in the design and construction industry for 28 years, specializing in water, moisture and air intrusion prevention into the building envelope. Skopic is active in CSI, RCI, BEC (Building Enclosure Council), and serves on committees for ABAA (Air Barrier Association of America). He can be reached at tskopic@henry.com or 410-960-3059.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • two-roofers-in-harnesses-on-tile-roof

    How AI Is (and Isn’t) Impacting Roofing Jobs

    A new study from Microsoft shows artificial intelligence...
    Roofing News
    By: Chris Gray
  • Baker-Roofing-Company-employees-on-flat-roof-examinining-paperwork

    Exclusive: 2025’s Top 100 Roofing Contractors

    Roofing Contractor's 2025 Top 100 list reveals revenue...
    Top 100 Roofing Contractors
    By: Chris Gray
  • A before and after heat measurement comparison

    How Hot is Too Hot in the Attic?

    If the ventilation is working, how hot should the attic...
    Columns
    By: Paul Scelsi
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Sign Up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Roofing Contractor audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Roofing Contractor or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • A finished commercial roof, including flashings
    Sponsored byFlashCo

    It’s All in the Details – How to Avoid 4 Common Mistakes with Roofing Accessories

  • Happy mature couple using phone holding credit card making payments. Middle aged older man and woman doing ecommerce shopping on smartphone booking or buying online on mobile sitting at home table.
    Sponsored byWatercress Financial

    Meeting Modern Expectations: Why Offering Financing Is Essential for Roofers Today

  • A roofing contractor stands on a roof behind an American flag
    Sponsored byTAMKO®

    Building Roofs, Building Community: TAMKO’s Lasting Commitment to Veterans and the Military

Popular Stories

TWS Remodeling team

Private Equity Fallout Rocks Roofing; Pros Step In

Malarkey-logo-with-Charles-Collins-headshot

Malarkey Roofing Products Announces New President

roofer-safety-harness-construction.jpg

OSHA's Top 10 Most Cited Violations of 2025

Roofing Contractor Bookstore

Related Articles

  • Carlisle Building Envelope System Protects World-Class Research Center

    See More
  • A Special Building Envelope for the Special Forces: Cannon Air Force Base’s New Facility Utilizes Metal Panels

    See More

Related Products

See More Products
  • Green Roof Systems: A Guide to the Planning, Design and Construction of Building Over Structure

  • urban resilience.jpg

    Green Roof Retrofit: Building Urban Resilience

  • tcr.png

    The Complicated Roof – A Cut and Stack Workbook

See More Products
×

Be in the forefront of the roofing industry!

Join thousands of professionals today. Shouldn’t you know what they know?

JOIN NOW!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing