Technical Details: Proper Application of SPF Systems

Proper application of sprayed polyurethane foam (SPF) systems is required for the long-term success of the system. Installation is comprised of three stages...



Proper application of sprayed polyurethane foam (SPF) systems is required for the long-term success of the system. Installation is comprised of three stages:
  1. Substrate preparation.
  2. SPF application.
  3. Coating application.

Each phase has its own idiosyncrasies that require proper attention. The materials should be applied by skilled applicators in accordance with the material manufacturer's requirements.

Photo courtesy of Arkema Inc.

Substrate Preparation

SPF systems involve adhered materials that require clean substrates for proper adhesion. The substrate - whether it is for new or recover applications - should be free of all dirt, dust and contaminants that can have an adverse effect on the adhesion of the foam to the substrate. Removal of dust and contaminants can be completed through the use of air pressure, vacuum equipment, manual brooming or sandblasting, depending on the substrate surface and the severity of the contaminants.

Surface moisture can also have a detrimental impact on the foam's adhesion capacity. SPF is typically comprised of a mixture of two components: isocyanate and polyol. Moisture that comes in contact with the foam during application can disrupt the mix ratio balance of the two components, creating foam with a soft, spongy cell structure. The foam in this state is weaker, less thermally efficient and susceptible to blister formation. On new construction projects, moisture on the surface is easily detectable. Moisture in the existing system on recover applications must be determined through a proper moisture analysis. All wet materials should be removed prior to the SPF application.

Application of SPF over existing roof systems requires further preparation procedures. In addition to removal of all wet materials, all defective membrane conditions (blisters, ridges, splits, etc.) should be cut out and properly repaired. Anchoring of poorly adhered membrane or insulation is required. The existing system should also be free of all irregularities that would impede proper SPF adhesion, such as voids or mastics. All flashing materials should be properly repaired of defects and securely anchored to the substrate. The SPF applicator should also ensure that all penetrations are properly waterproofed prior to the application. All drains and penetrations should be masked. Piping, electrical conduits and electrical lines should be relocated prior to SPF application, as they should not be covered in the SPF application process.

SPF Application

The foam spraying operation is the most critical point of the SPF application. Application rates and weather conditions must conform with the manufacturer's requirements. Application of SPF is completed in lifts (the foam thickness sprayed per pass), since the foam is not applied to its total thickness in one spray application. Typical SPF applications require a minimum total thickness of 1 inch with a minimum of 1/2 inch per pass. Once the foam is sprayed in place a base coat is required to protect the foam from ultraviolet radiation. The total foam spray thickness and base coat application must be applied the same day, and larger roof areas should be segmented into sections to achieve full application on a daily basis. Cure time is based on ambient temperatures and the thickness of the foam application. The manufacturer should be consulted regarding the proper cure time, and all roof traffic should be avoided until the SPF is completely cured.

The surface finish must be applied in a smooth, even application. The surface should resemble an orange peel (or a coarse orange peel). Surfaces that resemble popcorn will require additional coating because these finishes are susceptible to cracking and openings. The surface finish must be completed with the SPF manufacturer's approved coating at approved application rates. SPF application should only be completed by properly trained and skilled applicators.

Ambient weather conditions can also contribute to the success or failure of these systems. SPF is a temperature-sensitive material and there are strict temperature regulations (as there are with other roof systems). Application must not be completed in wet conditions or if there is a call for precipitation prior to proper cure. The ambient outside temperatures during application should be above 40°F or within 5° of the dew-point temperature. Because this is a sprayed application, wind speeds should be below 12 mph on projects without windscreens (such as parapet walls, etc.) and 20 to 25 mph when there are windscreens.

Coating Application

Coating applied on SPF systems is typically a liquid elastomeric coating that is applied in two coats. As mentioned, the base coat is applied on the same day as the SPF application. The base coat is typically darker than the final coat so that the applicator can readily depict the areas that have already been coated during the final coating process. The coating should be applied in a uniform and even application, with the thickness determined by the texture of the foam surface. More coating is required for irregular surfaces than even foam surfaces. After the coating is applied and cured, the applicator should inspect the area for thin coating applications, pin holes, blisters and cracks. Proper repairs should be completed prior to departure from the project.
John A. D’Annunzio is President of Paragon Roofing Technology Inc., a construction engineering firm he founded in 1989. He is the editorial director of Architectural Roofing & Waterproofing and a technical columnist for Roofing Contractor. He has published more than 100 articles and has written four books on building exterior issues. For more information, visit www.paragonroofingtech.com. He can be reached at 248-936-8744.

Recent Articles by John D'Annunzio

You must register or login in order to post comments.

Multimedia

Videos

Image Galleries

Shots From The Maverick: 2012 Fundraiser Benefits Colorado Youth Outdoors

The Maverick was held May 4-6 at Sylvan Dale Guest Ranch in Loveland, Colo. The event is a sporting clays shoot and fundraiser for Colorado Youth Outdoors, whose mission is to strengthen relationships between youth and their parents through traditional outdoor activities.Several members of the roofing industry were on hand to support the event, whose corporate sponsors include Prologis and Johns Manville. 

Podcasts

It Was an Interesting Week
Damato of the Day Is ... "It Was an Interesting Week" -  August 15, 2011
More Podcasts

THE MAGAZINE

Roofing Contractor Magazine

cover

May 2012

 Come check out the May 2012 issue of Roofing Contractor Magazine!

TABLE OF CONTENTS SUBSCRIBE

Roofing Contractor STORE

Roofing_Construction_&_Esti.gif
Roofing Construction & Estimating

Covers sheathing and underlayment techniques, as well as secrets for installing leakproof valleys. Many estimating tips help you minimize waste, as well as insure a profit on every job.

More Products

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Best of Success

Best of SuccessTake Your Roofing Skills to the Next Level! Learn new and improved ways to run your roofing business. Click here to read more about Best of Success!

STAY CONNECTED

Roofing Contractor's Facebook Page Twitter Linked INyoutube